Showing posts with label wood firing. Show all posts
Showing posts with label wood firing. Show all posts
Monday, September 23, 2013
Tuesday, November 27, 2012
The Dragon fly-ash Gama
November 23rd -24th 2012-YEAR OF THE DRAGON-
The first firing was extraordinary! Everything went smoothly. The kiln was surrounded by passionate people, alot of wood and beautiful moon rays.
The temperature rose gradually the entire time. We all stayed relaxed but focused. The last 3 hours were very intense but very exciting. And out of the blue 6 friends showed up almost at the same time. They brought their energy, encouragement, food and enormous help. The firing lasted about 24hours including the warming-up.
Soon we'll open the kiln to reveal it's potential. I am extremely thankful to all the elements that made this amazing experience come through.
The first firing was extraordinary! Everything went smoothly. The kiln was surrounded by passionate people, alot of wood and beautiful moon rays.
The temperature rose gradually the entire time. We all stayed relaxed but focused. The last 3 hours were very intense but very exciting. And out of the blue 6 friends showed up almost at the same time. They brought their energy, encouragement, food and enormous help. The firing lasted about 24hours including the warming-up.
Soon we'll open the kiln to reveal it's potential. I am extremely thankful to all the elements that made this amazing experience come through.
| November 23rd 2012, loading the kiln for the first time 9am |
| Daniel in the kiln |
| 4PM, the kiln is almost full |
| Start of kiln around 6h30pm |
| 24th of november 2012, 1AM, the fire is finally warming us up a little |
| It is -4 oustide and it snowed |
| 8AM, around cone05 |
| 8h25AM, chopping wood into smaller strips |
| The chopper |
| 9AM , the kiln is going gradually and stongly |
| THE DREAMTEAM |
| 2h30PM The sensei |
| 3h30 and cones 5 and 8 and 9 are down |
| 4h20, the final countdown begins as cone 10 is bending |
| Full steam ahead |
| 5h30pm,Final reduction |
| Fire show begins! |
| Impressive flammes! |
| An unforgettable adventure |
Sunday, October 21, 2012
Building the Dragon
| October 1st 2012, it's a miracle because I have a dream team all in place and booked to help me build my kiln. Laying the floor with cement blocks. |
| measuring distances with the wooden frame |
| Daniel was the designer of the kiln and played the most important role |
| Me, mixing mortar. Alot more to go. |
| Hard brick walls are going up before the floor. I would have finished the floor before starting the walls. J-D's technique. A very good idea. |
| Jean-David, a friend and a masson taught us many tricks of the trade. Insulating the floor before putting the bricks. |
| Great team work. Starting the arch. |
| More work on the arch putting a fireclay and grog mix between bricks. |
| The arch is done. It took 2 days to finish it. |
| A great moment, removing the frame and seeing if it all holds together. |
| Looks good and straight! |
| Jean-David |
| Bryan and Veronik (left) taking care of the roof to come. |
| Building the door. Pascale (inside) helping with the scrapping inside the kiln. |
| The door is finished and Daniel has the pleasure and honour to bang the clef de voûte. |
| Stephane(with mask) helping with the insulation of the arch. |
| covering the kiln with mortar. (me) J-D (left) getting the chimeney started. the chimeney is 2 thicknesses of soft brick. |
| David, also a masson, was a huge help all along |
| The chimeney being finished with cement block on the outside and 2 thicknesses of soft bricks on the inside. |
| It's the last day. The kiln and the door and the chimeney are all finished. It was a long day. |
Subscribe to:
Posts (Atom)


